Installation steps and precautions of integral sho

2022-07-22
  • Detail

In the installation process of our family's overall shower room, if we have enough understanding of the installation steps and precautions of the overall shower room, then we ourselves are a good supervisor. Today, I will follow you to see the installation steps and precautions of the overall shower room for your reference

in the installation process of our family's overall shower room, if we have enough understanding of the installation steps and precautions of the overall shower room, then we ourselves are a good supervisor. Today, I will follow you to see the installation steps and precautions of the overall shower room for your reference

installation steps of the overall shower room

1. To install the bottom basin of the shower, first of all, the parts of the bottom basin should be combined to determine the levelness of the bottom basin, so as to ensure that there is no water in the basin. The pipe should expand and contract with the distance, and then the clean basin bottom should be firmly connected with the floor drain

2. Test and protection: after installation, water test inspection is required to ensure that the water is unobstructed. Locating and drilling: use pencil and level ruler to determine the drilling position of aluminum materials against the wall, and use impact drill to drill holes

3. Installing aluminum: knock in rubber particles at the drilling hole, and lock the aluminum strip on the wall with screws

4. Fix the glass: lock the glass clamp at the bottom basin drilling hole, and then fix it with screws

5. Installation of pipe jacking: drill holes at the corresponding position above the fixed glass, install (straight/inclined) fixed seats and connect the pipe jacking. Fix it on the top of the glass with a elbow sleeve

6. Installing the shelf: measuring the position, installing the sanitary ware

7. Installing the movable door: install the hardware of the movable door, and install the hinge at the reserved hole of the fixed door. After installation, adjust the position of the shaft core of the lotus leaf until the door feels the best

8. Waterproof: install suction strips or water retaining strips on the side or below the glass as required. Use silica gel to close the joints between aluminum and wall, glass and bottom basin

9. Debugging and fastening: check whether each part is comfortable and smooth, and adjust it in time if any problem is found. After adjustment, tighten the corresponding screws to make the whole shower room more secure

10. Finishing work: clip the decorative aluminum strip into the wall aluminum material to ensure its neat and generous appearance. Finally, wipe the whole bathroom with a rag

installation precautions of the overall shower room

1. In order to ensure the smoothness of the pulley of the overall shower room, lubricant or peanut oil can be added appropriately

2. When the pulley of the track type shower room is loose or falling off, it is necessary to find the maintenance personnel to adjust in time to ensure the effective bearing of the pulley on the movable door, and then clean the foreign matters in the track with paper towel stained with peanut oil to ensure smooth sliding; Avoid hitting the movable door with force, so as not to cause the movable door to fall off

3. Do not hit the glass with sharp hard objects, especially the four corners

the relevant information about the installation of the overall shower room is introduced here. I hope this article is helpful to you. If there is anything else you don't understand, you can leave a message to Xiaobian below, and we will answer it for you as soon as possible